Skip to content
← All use cases

Unit cost

We do the same work. Why does it cost us more?

We take the cost of one job apart and check which part grew: time on site, travel, rework, paperwork or material.

Book a free consultation

30 minutes, no obligation.

One service job: what the job sheet shows and what comes on top

Illustrative example on fictional data: the average cost of one installation service. On the job sheet, meaning work on site and material, the cost grows from PLN 360 to PLN 394, or 9%. Adding the work the job sheet does not show — longer travel (from 40 to 65 minutes), more return visits for rework (from 6% to 14% of jobs) and longer paperwork — the full cost grows from PLN 444 to PLN 543, or 22%.

The split shows where to look. Why there is more rework and longer travel is established in the data and with your team.

In this example

Which data we compare
Jobs and their types, working and travel time, material costs, return visits for rework and paperwork time.
What can be established
Which part grew, since when and in which teams or job types. Gaps, such as unrecorded paperwork time, are marked.
What you get
A comparison of unit cost, the places that need checking and a possible next step. Automation is one of the options.

Questions that keep coming up

We compare unit cost between branches, teams and job types, calculated the same way.

Sometimes, for example when paperwork time grows. Sometimes a change of routes, a checklist or a supplier works better. The decision is yours.

Free consultation

Let's talk about your company and see where AI will work for you

On the initial call we will agree which data to compare and where to start.

In 30 minutes we look at where AI can save your company time or money and where to start. You can also simply name the problem or the goal, and we will lead the conversation.

Don't want to wait? Call

+48 730 ••• •••
Tomasz Pijanowski

Book a free consultation

+48
  • Your data is safe
  • No obligation
  • We'll call you within one business day